Skip to content

AS9100 · Kansas City, MO

AS9100 consulting for Kansas City's avionics base.

Kansas City aerospace runs on electronics: avionics, radio systems and circuit boards. For those suppliers, AS9100's counterfeit part controls matter most.

Kansas City is our home market. When being in the building matters — the gap analysis walkthrough, internal audits, the certification audits — we are already here.

Where the aerospace work here is

Our main Kansas City page leads with ISO 9001, and our Wichita page covers airframes and aerostructures. This page is about the aerospace work in this metro, which looks different from Wichita's.

Here, it is mostly electronics. Garmin designs and builds avionics in Olathe. In February 2024, Honeywell announced an $84 million expansion of its Olathe aerospace facility, now part of Honeywell Aerospace, independent since June 29, 2026. The plant makes components for avionics, safety and flight control systems, and radio frequency systems such as collision avoidance, radar altimeters and weather radar. Honeywell tied the investment to a domestic supply chain for avionics and printed circuit board assemblies.

That changes which part of AS9100 does the heavy lifting. For a machine shop, it is usually first article inspection and special processes. For an electronics supplier, it is counterfeit part prevention. AS9100D clause 8.1.4 requires a counterfeit part prevention process, and its note lists seven elements to consider: training, obsolescence monitoring, approved sources, traceability, verification and testing, monitoring of counterfeit reports, and quarantine and reporting of suspect parts.

Electronics customers often go further and flow down SAE AS5553, the aerospace standard for counterfeit electronic parts, now at revision E. If your purchase order names it, your counterfeit process has to be built to AS5553, not just to the AS9100 clause.

Obsolescence is the quiet driver. Avionics programs run for decades, and parts go out of production long before the aircraft does. A supplier that cannot show how it tracks end-of-life notices and qualifies alternate sources will struggle with this clause, even if it has never seen a counterfeit part.

It is also where the standard is heading. IAQG's published draft of the next revision, IA9100, turns the notes on counterfeit part prevention into requirements (see our IA9100 tracker). A counterfeit process built properly now will carry forward.

The manufacturing base here

The Kansas City metro has 1,636 manufacturing establishments, and 89% of them employ fewer than 100 people (1,449 of them, per US Census County Business Patterns, 2023). That puts it 32nd by small-manufacturer base among the 194 US markets we cover.

Our home metro, with the National Security Campus supply chain, two auto assembly plants and the Animal Health Corridor.

What an engagement covers

  • Flow-down review We read the quality clauses on your purchase orders: AS9100, AS5553, customer-specific requirements, and anything that sits outside the standard.
  • Counterfeit part prevention A process built to clause 8.1.4 and, where customers require it, to AS5553: approved sources, traceability, verification, quarantine and reporting.
  • Obsolescence monitoring A working method for tracking end-of-life notices and qualifying alternate parts, sized for a supplier without a components engineering department.
  • ISO 9001 to AS9100 upgrade If you hold ISO 9001, we add the aerospace layer to the system you already run. See AS9100.
  • Internal audits Auditor-grade internal audits against AS9100D before the certification body arrives, including a hard look at the counterfeit process.
  • Gap analysis and roadmap Two to four weeks, fixed price, on site in our home metro.

Questions we get from Kansas City companies

We build circuit board assemblies. Is AS9100 enough for aerospace customers?

It is the base, and often not the whole list. Many electronics customers add AS5553 for counterfeit electronic parts, their own supplier quality requirements, and workmanship standards for soldering and assembly. The quality clauses on your purchase order set the full list, so we read those before we scope anything.

We have never had a counterfeit part. Why does the auditor care?

Because the clause is about prevention, not history. AS9100D clause 8.1.4 requires a counterfeit prevention process, and its note lists what it should consider: training, obsolescence monitoring, approved sources, traceability, verification, monitoring of counterfeit reports, and quarantine and reporting of suspect parts. An auditor will look for evidence that the process runs: approved source lists, traceability records, training records and a defined route for a suspect part.

Should we wait for IA9100 before we certify?

No. IAQG has not published IA9100, a release date or a transition deadline, and your customers' purchase orders call for AS9100 today. The published draft strengthens counterfeit part prevention, so building that process well now is the best preparation for the revision.

We supply customers in both Kansas City and Wichita. Can one system cover both?

Yes. One AS9100 system can serve every customer. What differs is each customer's flow-down, so we map requirements customer by customer rather than metro by metro. We work in person in both markets, which helps when the audits and the customers are 200 miles apart.

More in Kansas City

Our Kansas City page leads with ISO 9001 and carries the local research this page builds on.

Nationwide: AS9100 consulting services.

Also in Kansas City: ISO 14001, ISO 13485.

Nearby metros: Wichita, KS; St. Louis, MO; Springfield, MO; Topeka, KS; St. Joseph, MO; Lincoln, NE.